Process Piping
Fabrication and installation of process lines for pharmaceutical, food, chemical and plant applications, built to approved drawings and project requirements.

Engineering, fabrication, installation, testing and supply for process, utility and gas systems — coordinated by one team, from approved drawing to documented handover.

Our combined portfolio supports projects involving process and utility systems, gas distribution and control, equipment erection, structural work, and inspection and validation — so one team owns the interfaces between trades.
From process lines to structure erection, every scope is planned against approved drawings and executed by the same coordinated crew.
Fabrication and installation of process lines for pharmaceutical, food, chemical and plant applications, built to approved drawings and project requirements.
Utility, air and water piping systems, from headers and branch lines to manifolds, coordinated with the rest of the plant scope.
Gas distribution piping, manifolds, regulator arrangements and gas panels for suitable industrial and laboratory applications.
HVAC-related piping and support work, including chilled-water lines, AHU connections, ducting supports and cleanroom interfaces.
PPR piping installation for water and utility services where the material suits the application and project specification.
Industrial platforms, structural assemblies, pipe supports, equipment erection and material shifting, planned around site access and lifting controls.
Review the application, drawings and project requirements.
Coordinate materials, fabrication, installation and testing activities.
Follow approved project procedures and applicable acceptance criteria.
Document agreed inspection and test results for handover.
Orbital and manual TIG welding, spool fabrication and instrumentation tubing — executed to approved drawings, project procedures and acceptance criteria.

Mechanised orbital welding for tubing and piping where controlled, repeatable weld execution is required. Project-specific procedures and acceptance criteria apply.

TIG welding for stainless-steel and other specified pipe or tubing applications, with welder qualifications and code requirements verified for each project.

Fabrication of piping spools, manifolds, headers and related assemblies in line with approved drawings and material requirements.

Tubing installation and connection work using suitable tube fittings for gas, utility and instrumentation applications.
Inspection methods and verification activities carried out to the agreed procedure, with results documented for handover.
01Integrity verification of piping or equipment using an agreed method, pressure, duration and acceptance criteria, with records where specified.
02Treatment of stainless-steel surfaces to support corrosion resistance, carried out to the approved project procedure.
03Surface examination for discontinuities open to the surface on suitable non-porous materials.
04Fluorescent coverage evaluation to identify shadowed or missed areas in cleaning coverage, following the agreed method.
05Measurement of surface texture to check specified finish requirements on applicable surfaces.
06Non-destructive testing such as thickness measurement or evaluation of internal discontinuities, subject to procedure and qualification requirements.
Visual inspection of difficult-to-access internal surfaces without full disassembly, where applicable.
Tubing, fittings, valves, regulators, hoses, panels and custom fabricated items — each selected against the current datasheet and your project specification.
SS304, SS316 and SS316L tubing and pipe. Size, wall thickness and pressure class selected against the current datasheet.
Tube fittings and connectors for stainless-steel tubing; connection type, material and pressure rating verified.
Ball, needle, check and relief valves, plus pipe fittings and flanges in suitable materials and ratings.
High-pressure regulators, auto-changeover systems and gas control manifolds selected for the service.
Medium- and high-pressure hose assemblies with suitable material and end connections.
Panel and control-system arrangements for gas purification and distribution, configured to the approved service.
Manifold systems for air and water distribution, matched to the project’s material, size and pressure ratings.
SS and MS trolleys, cross-over benches, step ladders, pallets, cupboards, racks and tables.
Cleanroom panel and HVAC-related supply or installation support, subject to the agreed scope and specifications — coordinated with the process and utility piping around it.

Share your drawings or requirements and we’ll review the application, scope and specifications with you.